he Principal Designer under the Building Regulations plays a vital role in ensuring that construction projects meet all legal requirements and technical standards. By appointing Ingleton Wood as BRPD, you ensure the safety, quality, and compliance of your project. Ingleton Wood deliver the Principal Designer service using a team approach. This role is to provide expert review and opinion on all aspects of Building Regulations using our expert team to provide this oversight.

Solving global challenges one building at a time

Building Regulations Principal Designer

architecture building surveying building services planning interior design climate and sustainability civil and structural quantity surveying project management CDM and H&S services

In October 2023, the Building Safety Act enabled changes to the Building Regulations 2010, which created the roles of Principal Designer and Principal Contractor as well as introducing new Client duties towards construction projects. The role of the Principal Designer under the Building Regulations is distinct from that defined under the Construction (Design and Management) Regulations 2015 (CDM 2015). It is important to provide clarity on the responsibilities and importance of the Principal Designer within the context of the Building Regulations (BRPD).

key responsibilities

Coordination with Regulatory Authorities Effective communication with local authorities and other regulatory bodies is essential.The BRPD will: • Submit necessary plans and documents to the relevant authorities for approval. • Address any concerns or queries raised by regulatory bodies. • Ensure that any required amendments to the design are made promptly and accurately

Regulatory compliance The Principal Designer (BRPD) works alongside the design team to ensure that all aspects of the project comply with the Building Regulations.This includes: • Assessing the competence of your design team. • Verifying that the design meets all relevant technical standards and legal requirements.

Design assessment The BRPD is responsible for assessing and approving the design to ensure compliance.This involves: • Reviewing architectural, structural, mechanical and electrical plans and specifications. • Identifying any areas where the design may fall short of regulatory standards. • Providing guidance and recommendations to bring the design into compliance.

Ensuring that the construction methods and materials used adhere to the regulations. Keep up-to-date with any changes or updates to the Building Regulations to ensure that these are incorporated into the project by the design team.

Ingleton Wood approach

Benefits of appointing a

The Principal Designer under the Building Regulations plays a vital role in ensuring that construction projects meet all legal requirements and technical standards. By appointing Ingleton Wood as BRPD, you ensure the safety, quality, and compliance of your project. Ingleton Wood deliver the Principal Designer service using a team approach.This role is to provide expert review and opinion on all aspects of Building Regulations using our expert team to provide this oversight. For example, if the project needs an extensive review of the structural elements, then who better than a structural engineer to provide the commentary and advice required. Utilising our cross-practice expertise under the coordination of our specialist Principal Designer team, enables us to guide your project team towards a compliant and effective design.

Ensured compliance The Principal Designer ensures that the project adheres to all relevant Building Regulations, helping to avoid legal issues, fines, and potential project delays. Quality assurance With a dedicated professional overseeing the compliance aspect, the quality and safety of the construction phase is enhanced, leading to a more robust and reliable end product. Principal Designer under the Building Regulations

Who can be a Principal Designer? A Principal Designer under the Building Regulations should have: • In-depth knowledge of the Building

Risk mitigation By identifying and addressing regulatory issues early in the design process, the BRPD helps to mitigate risks associated with non-compliance, such as structural failures or safety hazards. Legal requirements Under the Building Regulations, it is mandatory to appoint a Principal Designer to ensure that the design phase of the project meets all regulatory standards.This role is crucial for obtaining the necessary approvals and certifications from regulatory authorities.

Regulations and relevant standards across all construction consultancy disciplines. Experience in design assessment and regulatory compliance. Strong communication skills to liaise effectively with regulatory authorities and the project team.

Billericay 10 Lake Meadows Business Park Woodbrook Crescent Billericay Essex CM12 0EQ

Cambridge 1a Oakington Business Park Oakington Cambridge CB24 3DQ

Colchester 874 The Crescent Colchester Business Park Colchester Essex CO4 9YQ

London The Loom 14 Gower’s Walk London E1 8PY

Norwich 8 Whiting Road Norwich Business Park Norwich Norfolk NR4 6DN

Nottingham Suite 24 Pure Offices

Oxford Unit 16

Thorney Leys Business Park Witney Oxfordshire OX29 7DX

Lake View Drive Sherwood Park Nottingham NG15 0DT

T: 01277 637800

T: 01223 202040

T: 01206 224270

T: 020 7680 4400

T: 01603 666847

01623 729300

T: 01865 411475

buildingsafety@ingletonwood.co.uk www.ingletonwood.co.uk

Page 1 Page 2-3 Page 4-5 Page 6

Powered by